Hampton case study

Through the process the owners became confident that American could not only do the work, but could also be trusted to complete the job while the owners were on a long planned month long vacation in Australia and New Zealand. Solar Thermal System Savings: The position of the building on the site, along with the procurement of all the materials and equipment was analyzed through this model prior to construction.

Zero CFC based refrigerants will be used which minimizes the impact on the ozone depletion. Storm water system Building position maximizes solar energy lighting resources while limiting impact on cooling costs Outside structures allow for perfect natural lighting The storm water system is designed to store, filter and clean the water on site before being released into the waterways.

The hotel developers, Finergy Development LLC, strived to Hampton case study the environmental impact of the project from the point of site selection, throughout the construction process, up to the day-to-day operations of the hotel.

Hampton Inn - Sarasota, Florida

The Air Conditioning and water heater systems selected are among the most energy efficient available on the market. The site was developed to increase the open spaces beyond the zoning guidelines, thereby minimizing the footprint.

The Solar package included project engineering, installation, and funding. What exactly does this mean? The site required minimal additional infrastructure for waste, water and traffic patterns. The final design plan incorporated the new kitchen, an expansion of the living room by bumping out the front section of the house and renovating the master bath area on the first floor of the house.

Native landscape requires little water Low output irrigation with sensors reduces water usage Reclaimed water used for irrigation The site landscaping uses native plants that, once established, will require watering only during the driest months.

Planning included a kitchen design by Canton Kitchens, a lighting plan for the space and design elements for the exterior of the house, including a new custom made front door. Cleaning solutions are bio-degradable.

One of the owners, a principal at a leading commercial architecture firm in the area, created her own construction drawings for the renovation. The system is anticipated to generate up to 1. From the beginning, our brochures and sales collateral have all been printed on recyclable paper.

This high local material percentage reduces the impact of transportation on the environment, while also maintaining the local economy.

A similar strategy was used for the rooftop, where reflective, Energy star rated material was installed to reduce the heat absorbed by the rooftop.

Using motion detection and door switch sensors, the system resets the thermostat settings when the room is unoccupied. The building position on the site maximizes the resources of the Florida sunshine for lighting and solar power, while limiting the impact on cooling costs.

In addition to the water savings from the irrigation system, Potable water usage will be reduced by a third by the use of water saving fixtures in the guest rooms and public areas. Zero CFC Air conditioner refrigerant Smart sensors Glazing is utilized on the exterior surface of the building that transmits visible light, but rejects the hot Florida sun.

Special care was given to maintain the health of the oak trees fronting University Parkway. Solutions After an initial bidding process the owners selected American Contracting to work with them to develop a final plan that incorporated their design ideas to work within their budget.Case Study The following is a case from our office records.

A 20 year old male presented to our practice with a 38 degree scoliosis. Secondary conditions present because of the structural changes: Neck pain, neck stiffness, shoulder pain, upper back pain, lower back pain, pain in the knee and trouble sleeping.

Case Study

The chiropractor performed an. The owners of this house in the Hampton section of Towson purchased the square foot structure in As they lived in the home for a while they determined that there were necessary changes to make to improve their living in the home.

Hampton Machine Tool Company, a machine tool manufacturer, was founded in Hampton's customer base is made up primarily of military aircraft manufactures and.

Hampton Case Study - Download as Word Doc .doc /.docx), PDF File .pdf), Text File .txt) or read online. Hampton case study.

Recent Topics

CertainTeed High Performance Exterior Sheathing CASE STUDY: HAMPTON INN & SUITES Project: Glass-Reinforced Exterior Gypsum Sheathing Location: Towanda Avenue, Normal, Illinois, McLean County (in the heart of Central Illinois, miles southwest of Chicago). Read this essay on Hampton Case Study.